Appendix I. Status of Completion of 1998 Key Performance Indicators



1.    Concurrent high-volume and low-volume aerosol sampling at two locations through 1998. [Completed]

2.    Initiate operation of high volume aerosol sampler at third location at WIPP site prior to May 1998. [Completed]
3.    Assume responsibility for one FAS sampling port in WIPP exhaust shaft prior to May 1998. [Delayed, completed
        December 1998]
4.    Complete collection of triplicate soil samples at current 32 locations by May 1998. [Delayed, completed June 1998]
5.    Concurrent operation of meteorological sampling stations at two sites through 1998. [Completed]
6.    Collect drinking water samples at 6 sources in April 1998; repeat sample collection in August 1998. [April collection
        completed; August collection delayed, completed December 1998]
7.    Collect sediment and surface water samples at three locations in February 1998 and July 1998. [February collection
        delayed, completed March 1998; July collection delayed, completed October 1998]
8.    Collect animal and vegetation samples during spring and fall 1998. [Vegetation and animal (arthropod) collection
        completed]
9.    Continue in vivo bioassays for public to include at least 200 people including repeated measures on individuals in
        1997 studies. [Bioassays for over 250 people completed, repeat measurements postponed to begin in 1998.]
10.    Radioanalyses of segment of 1997 soil, vegetation and aerosol samples, and spring 1998 drinking water samples.
        [Not completed; radioanalyses completed for subset of 1998 soil, sediment and surface water samples only]
11.    Inorganic trace element analyses of representative subset of low-volume aerosol samples and soil samples by July
        1998. [Completed]
12.    Implement electronic Laboratory Information Management System by June 1998. [Not completed; system
        procured, implementation delayed]
13.    Issue two reports of community studies by April 1998. [Completed]
14.    Make CEMRC reports accessible via Internet by March 1998. [Completed]
15.    Present summary of data from analyses in 1998 CEMRC report. [Completed]
16.    Submit manuscripts for publication on radioanalyses of aerosols and soils. [Not completed, due to delay in
        completion of radioanalyses]